My Cart  

Case Studies

10 Lower Thames Street Case Study

8-Car Group - Number 10 Lower Thames Street

London
Premier Inn Case Study

Premier Inn

Gatwick, West Sussex
One Croydon Case Study

One Croydon

Surrey
Glasgow Housing Association Case Study

Glasgow Housing Association (GHA)

Glasgow
Royal Albert Hall Case Study

Royal Albert Hall

London
Bristol Royal Infirmary Case Study

Bristol Royal Infirmary

Bristol
St. Ann's Square Case Study

St. Ann's Square, Manchester

Almega II with Wi-Fi and App
The Equinox Building, Glasgow Case Study

The Equinox Building, Glasgow

Almega II Triplex Group Control Solution
British Airways Heathrow Case Study

British Airways

Heathrow
Park Plaza County Hall Case Study

Park Plaza County Hall, London

17-Stop Triplex Lift Group
Paragon Brentford Case Study

Paragon Brentford High Rise Duplex

Otis Gen2 Modernisation
Hilton The DoubleTree Case Study

Hilton & The DoubleTree at ExCel

London
Ageas Bowl Case Study

Hilton Hotel at the Ageas Bowl

Southampton
Thyssen Synergy Case Study

Thyssen Synergy

7-Storey Lift Modernisation
Inner City Social Housing Case Study

Inner City Social Housing

Lewisham, London
Hydratec smart™ Case Study

Hydratec smart™

 
Selfridges Case Study

Selfridges

London
Odeon Cinema Case Study

Odeon Cinema

Leicester Square, London
Charing Cross Hospital Case Study

Charing Cross Hospital

London